Robust multi-objective hybrid flow shop scheduling

سال انتشار: 1400
نوع سند: مقاله ژورنالی
زبان: انگلیسی
مشاهده: 334

فایل این مقاله در 16 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

JR_APRIE-8-1_004

تاریخ نمایه سازی: 1 اردیبهشت 1400

چکیده مقاله:

Scheduling is an important decision-making process that aims to allocate limited resources to the jobs in a production process. Among scheduling problems, Hybrid Flow Shop (HFS) scheduling has good adaptability with most real world applications including innumerable cases of uncertainty of parameters that would influence jobs processing when the schedule is executed. Thus a suitable scheduling model should take parameters uncertainty into account. The present study develops a multi-objective Robust Mixed-Integer Linear Programming (RMILP) model to accommodate the problem with the real-world conditions in which due date and processing time are assumed uncertain. The developed model is able to assign a set of jobs to available machines in order to obtain the best trade-off between two objectives including total tardiness and makespan under uncertain parameters. Fuzzy Goal Programming (FGP) is applied to solve this multi objective problem. Finally, to study and validate the efficiency of the developed RMILP model, some instances of different size are generated and solved using CPLEX solver of GAMS software under different uncertainty levels. Experimental results show that the developed model can find a solution to show the least modifications against uncertainty in processing time and due date in an HFS problem. 

کلیدواژه ها:

نویسندگان

Behnaz Zanjani

Department of Industrial Management, Faculty of Accounting and management, Allameh Tabatabai University, Tehran, Iran.

Maghsoud Amiri

Department of Industrial Management, Faculty of Accounting and management, Allameh Tabatabai University, Tehran, Iran.

Payam Hanafizadeh

Department of Industrial Management, Faculty of Accounting and management, Allameh Tabatabai University, Tehran, Iran.

Maziar Salahi

Department of Applied Mathematics, Faculty of Mathematical Sciences, University of Guilan, Rasht, Iran.

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • [1]        Uysal, F., İşleyen, S. K., & Çetinkaya, C. (2018). ...
  • [2]        Bougeret, M., Pessoa, A. A., & Poss, M. (2019). ...
  • [3]        Rafiei, A., Homayouni, S. M., & Shafiei Alavijeh, A. ...
  • [4]        Ebrahimi, M., Ghomi, S. F., & Karimi, B. (2014). ...
  • [5]        Ribas, I., Leisten, R., & Framiñan, J. M. (2010). ...
  • [6]        Linn, R., & Zhang, W. (1999). Hybrid flow shop ...
  • [7]        Shiau, D. F., Cheng, S. C., & Huang, Y. ...
  • [8]        Wang, H., Jacob, V., & Rolland, E. (2003). Design ...
  • [9]        Choi, S. W., Kim*, Y. D., & Lee, G. ...
  • [10]    Choi, S. H., & Wang, K. (2012). Flexible flow ...
  • [11]    Luo, H., Du, B., Huang, G. Q., Chen, H., ...
  • [12]    Naderi, B., Gohari, S., & Yazdani, M. (2014). Hybrid ...
  • [13]    Tang, D., Dai, M., Salido, M. A., & Giret, ...
  • [14]    Rahmani, D., & Heydari, M. (2014). Robust and stable ...
  • [15]    Lin, J. T., & Chen, C. M. (2015). Simulation ...
  • [16]    Wagner, H. M. (1959). An integer linear‐programming model for ...
  • [17]    Manne, A. S. (1960). On the job-shop scheduling problem. Operations ...
  • [18]    Guinet, A., Solomon, M. M., Kedia, P. K., & ...
  • [19]    Bowman, E. H. (1959). The schedule-sequencing problem. Operations research, 7(5), 621-624. ...
  • [20]    Meng, L., Zhang, C., Shao, X., Zhang, B., Ren, ...
  • [21]    Elyasi, A., & Salmasi, N. (2013). Stochastic flow-shop scheduling ...
  • [22]    Wang, Y., & Li, L. (2014). Time-of-use based electricity ...
  • [23]    Mirmohseni, S. M., Nasseri, S. H., & Khaviari, M. ...
  • [24]    Li, Z., & Ierapetritou, M. G. (2008). Robust optimization ...
  • [25]    Nagasawa, K., Ikeda, Y., & Irohara, T. (2015). Robust ...
  • [26]    Shahnaghi, K., Shahmoradi-Moghadam, H., Noroozi, A., & Mokhtari, H. ...
  • [27]    Emami, S., Moslehi, G., & Sabbagh, M. (2017). A ...
  • [28]    Hamaz, I., Houssin, L., & Cafieri, S. (2018). A ...
  • [29]    Ding, H., Fan, Y., & Zhong, W. (2018). Robust ...
  • [30]    Jamili, A. (2019). Job shop scheduling with consideration of ...
  • [31]    Goli, A., Babaee Tirkolaee, E., & Soltani, M. (2019). ...
  • [32]    Sangaiah, A. K., Tirkolaee, E. B., Goli, A., & ...
  • [33]    Babaee Tirkolaee, E., Goli, A., Pahlevan, M., & Malekalipour ...
  • [34]    Sadjadi, S. J., & Omrani, H. (2008). Data envelopment ...
  • [35]    Soyster, A. L. (1973). Convex programming with set-inclusive constraints ...
  • [36]    Ben-Tal, A., & Nemirovski, A. (1999). Robust solutions of ...
  • [37]    Bertsimas, D., & Sim, M. (2004). The price of ...
  • [38]    Narasimhan, R. (1980). Goal programming in a fuzzy environment. Decision ...
  • [39]    Hu, C. F., Teng, C. J., & Li, S. ...
  • [40]    Baky, I. A. (2009). Fuzzy goal programming algorithm for ...
  • [41]    Hossain, M. S., & Hossain, M. M. (2018). Application ...
  • [42]    Gupta, S., Ali, I., & Ahmed, A. (2018). Efficient ...
  • [43]    Masoud, M., Khalifa, H. A., Liu, S. Q., Elhenawy, ...
  • نمایش کامل مراجع