Solving Bi-Objective Fuzzy Project Capital Budgeting Problem as a Multi-Dimensional Knapsack by Fuzzy 0-1 Programming

سال انتشار: 1387
نوع سند: مقاله کنفرانسی
زبان: انگلیسی
مشاهده: 2,216

فایل این مقاله در 17 صفحه با فرمت PDF قابل دریافت می باشد

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این مقاله:

شناسه ملی سند علمی:

IIEC06_056

تاریخ نمایه سازی: 8 مهر 1387

چکیده مقاله:

selection of optimum portfolio of projects when an organization is involve with a set of project with a pre-determined net present value and initial investment cost, has both practical and theoretical importance which has made a great willing for researchers in last decades. in real world the net present value, profit, resource requirements and initial investment cost of an undone or even ongoing project usually can not be estimated deterministically in advance. In real cases, projectoutcomes including net present value and its profit mixed with ambiguity and vagueness. Moreover in most of situations the decision maker has no clear sense about the exact amoount of total budget of the organization for next decision horizon and required resources for a project has a notable ambiguity. fuzzy environment can present these situations properly. we develop a full fuzzy mathematical programming with fuzzy initial investment cost and fuzzy profit of a project as well as fuzzy right hand side as total available budget in a decision making horizon. We associated the problem to 0-1 fuzzy NP-hard problem. The aforementioned problem have solved through a fuzzy 0-1 programming for this fuzzy project capital budgeting. the proposed fuzzy has been tested an illustrative numerical examples. Due to our best Knowledge, this contribution is rarely considered in this field at the time of paper development.

کلیدواژه ها:

نویسندگان

Kaveh Khalili Damghani

Department of system & Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran, Iran & Irankhodro Rail Industries Company (IRICO), Tehran, Iran

Mohammad Taghi Taghavifard

Department of system & Industrial Engineering, Tehran-South Branch, Islamic Azad University, Tehran, Iran

Mehdi Asadi

Irankhodro Rail Industries Company (IRICO), Tehran, Iran

مراجع و منابع این مقاله:

لیست زیر مراجع و منابع استفاده شده در این مقاله را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود مقاله لینک شده اند :
  • Rui Liang, Jinwu GaoD ependent (2008). Chance Programming Models for ...
  • Xiaoxia Huang (2007). _ an-variance model for fuzzy capital budgeting. ...
  • Xiaoxia Huang (2007). Optimal project selection with random fuzzy parameters. ...
  • Xiaoxia Huang (2007). Chanc e-constrained programming models for capital budgeting ...
  • Xiaoxia Huang (2006). C redibility-bas ed chanc e-constrained integer programming ...
  • Yupo Chan, Joseph P. DiSalvo, Michael W. Garrambone (2005). A ...
  • Simon Coldrick, Philip Longhurst, Paul Ivey, John Hannis (2005). An ...
  • Ralph E. Steuer, Paul Na, Multiple criteria decision making combined ...
  • Antonio E. Bernardo, Hongbin Cai, Jiang Luo (2001).Capital budgeting and ...
  • Masood A. Badri, Donald Davis, Donna Davis, A c omprehensive ...
  • M. Padberg, M. J. Wilczak, Optimal project selection when borrowing ...
  • Timothy Ch. U. Kalu, Capital budgeting under uncertainty: An extended ...
  • Kwun Ik Cho, Soung Hie Kim, An improved interactive hybrid ...
  • Raymond G. Taylor, A general form for the capital projects ...
  • Regine Slagmulder, Wermer Bruggeman, Luk van Wassenhove, An empirical study ...
  • Byoung Nam Lee, Ji Soo Kim, Capital budgeting model with ...
  • Rui Liang, Jinwu Gao, Dep endent- Chance Programming Models for ...
  • Xiaoxia Huang, Credibi lity-based chanc e-constrained integer programming models for ...
  • Vincenliu Dumitru, Florica Luban, On some optimization problems under uncertainty ...
  • Stefan Balev, Nicola Yanev, Arnaud Freville, Rumen Andonov, A dynamic ...
  • Konstantinos Kaparis, Adam N. Letchford, Local and global lifted cover ...
  • Tolga Bektas, Osman Oguz, On separating cover inequalities for the ...
  • Md Mostofa Akbar, M. Sohel Rahman, M. Kaykobad, E.G. Manning, ...
  • Michel Vasquez, Yannick Vimont, Improved results on the 0-1 multi ...
  • Arnaud Freville, The multidimens ional 0-1 knapsack problem: An overview, ...
  • V. Gabrel, M. Minoux, A scheme for exact separation of ...
  • Stavros G. Kolliopoulos, George Steiner, Partially ordered knapsack and applications ...
  • Umit Akinc, Approximate and exact algorithms for the fixed-charge knapsack ...
  • Samir Elhedhli, Exact solution of a class of nonlinear knapsack ...
  • Zimmermann, H.J., 1991. Fuzzy Set Theory and its Applications, second ...
  • نمایش کامل مراجع